Early in 2011 DSE closed the Lerderderg Track between Jubilee Lake and St Leonards Hill following storm damage. The track is still closed. GDTA has repeatedly requested that the track be reopened. At a meeting with DSE Midlands District in November 2011 the GDTA asked DSE to take urgent action to reopen the track.
DSE have advised that only DSE posts are allowed on their land. This means that on the Lerderderg Track between Jubilee Lake and Blackwood, DSE will replace all green GDT posts with grey DSE posts.
2010 is the International Year of Biodiversity
Click here for more information.
Buninyong to Daylesford
92km walk traversing the Great Dividing Range between Daylesford, Creswick, Ballarat and Buninyong
Wombat Station - Daylesford 19km
Thanks to the riches brought by gold, by the end of the 1880s Victoria had an extensive network of railways. Wombat Station is one example of many once busy stations and sidings once on the Ballarat to Daylesford railway line, which was built in 1887 and finally closed in the 1950s.
The track goes from the former station over a huge embankment (check out the brick tunnel underneath) and goes into a huge and deep railway cutting, now smack in the middle of the Wombat State Forest!
As you walk you are walking over the main fibre-optic cable, through which this website is coming!
The walk goes through the White Point Diggings and right past the beautiful Sailors Falls and mineral spring before following the creek valleys to Daylesford via Lake Daylesford.
The entry station can be located at Lake Daylesford.

Sailors Falls